Tiptree Jam Factory
Bulk Excavation, Slab and Drainage
Our team executed the groundworks and structural slab package for a new storage facility at the Tiptree Jam Factory, for Wilkin & Sons Ltd. The project focused on site preparation, heavy-duty flooring, and environmental drainage compliance. Our core scope included:
-
Bulk Excavation: Large-scale site clearance and earthworks to establish the building footprint.
-
Structural Concrete: Supply and installation of a reinforced concrete slab designed for high-load storage.
-
Drainage and Compliance: Installation of a new drainage system, including an oil and grease interceptor to meet site environmental requirements.
-
Site Preparation: Formation of the sub-base and preparation for the barn’s steel-frame erection.
The project provided a level, load-bearing foundation and compliant drainage infrastructure. Our work ensured the site was ready for immediate structural assembly according to the client’s build schedule.